Warning: Trying to access array offset on value of type bool in /home/topgsnkq/timelyhomework.com/wp-content/themes/enfold/framework/php/function-set-avia-frontend.php on line 570

Engineering economics

project

Find at least two alternatives to achieve your financial goals

-Collect your data from reliable source

-Select two problem solving methods to evaluate the alternatives.  1-present worth method, 2-Annual Equivalence, or Internal Rate of Return

Your report should be at least 6 pages including cover sheet, table of content, and references.

Use Word Document and EXCEL spreadsheet for typing ,calculation , and flow chart. Your solution should also include your own calculations with all formulas you are using.

Your report should include a Summary: Breif description of what your topic is and what methods you have used, and your conclusion (one or two paragraph)

Then in body of your report describe your goal , calculation methods, data, your assumptions, graphs, and excel spreadsheet  results (about 80-85% of your report)

In Conclusion explain breifly your results.

 
"Looking for a Similar Assignment? Order now and Get 10% Discount! Use Code "GET10" in your order"

If this is not the paper you were searching for, you can order your 100% plagiarism free, professional written paper now!

Order Now Just Browsing

All of our assignments are originally produced, unique, and free of plagiarism.

Free Revisions Plagiarism Free 24x7 Support