Warning: Trying to access array offset on value of type bool in /home/topgsnkq/timelyhomework.com/wp-content/themes/enfold/framework/php/function-set-avia-frontend.php on line 570
Please see below
To meet waste discharge standards, a factory implements a control system designed to prevent the release of wastewater that does not meet those standards. One of the controls requires chemical analysis of the water, prior to discharge, for components specified in the permit. Is this an appropriate control? Why or why not?