Warning: Trying to access array offset on value of type bool in /home/topgsnkq/timelyhomework.com/wp-content/themes/enfold/framework/php/function-set-avia-frontend.php on line 570
How to solve an answer: Mondo Cycle manufactures three different types of bikes, assignment help
Mondo Cycle manufactures three different types of bikes: The Tiny Tike, the Adult Aero, and the Mountain Monger. Given the production schedule in Table 10.11, including setup and processing times and lot sizes, calculate the required capacity for this year’s production. Note that the times are given for individual production lines, so capacity calculations should be in terms of the number of lines necessary. Assume that Mondo Cycle operates two shifts, each with 2,000 hours per year, and wishes to maintain a 15 percent capacity cushion.
TABLE 10.11
Annual demand |
Processing time (min) |
Average lot size |
Setup time (min) |
|
Tiny Tike |
1,200 |
6.0 |
120 |
50 |
Adult Aero |
1,800 |
12.0 |
450 |
49 |
Mountain Monger |
1,900 |
10.0 |
200 |
70 |